Tooele County MidValley Highway EA Study
 
  Purpose and Need | Project ScheduleThe EIS Process | Maps | Home
 
 
  Purpose and Need
 


The Proposed Action is needed to improve north-south transportation capacity in the middle of the Tooele Valley.

 
 
 
Study Overview How Can I Participate?

Planned Improvements

This figure shows the roadway improvements or new roadways that are planned to occur within the project study area. These improvements are planned to be built by Tooele City or Tooele County and are independent projects. However, the traffic analysis for these improvements or additions is accounted for in the Midvalley Highway environmental study process.

Planned City & County Improvements Map
(Not Part of This Project) View Enlarged Map [ 300 KB / PDF]

 

Planned Improvements Map

 

Baseline Improvements List*:

Project Road No Build 2030 Limits Assumptions
From To
I-80 New Interchange at Adobe Cut-off SR-201 (Salt Lake County) Widen I-80 to six lanes
SR-138 Grantsville SR-36 Widen to four lanes
Church Road Airport Road Cochrane Lane New minor collector
Future Parkway (3400 North) Grantsville City limits Droubay Road New minor arterial
2000 North SR-112 400 West Extend existing minor arterial
1000 North SR-112 SR-36 New four lane minor arterial
1000 North SR-36 Droubay Road Widen to four lanes.
1200 West SR-112 SR-138 Existing/new two lane minor arterial
400 West 1000 North Erda Way Improve two lane minor arterial; extend existing collector street
Droubay Road Skyline Drive SR-138 Extend existing minor arterial
700 South** Utah Industrial Depot SR-36 Extend existing collector street to the Utah Industrial Depot
Tooele Boulevard (north segment)* SR-112 1000 North New two lane minor arterial


*Note: Not all Improvements are a part of this project

Source: Draft Tooele Midvalley Highway EIS Traffic Report, May 2008
Tooele Valley Long Range Transportation Plan 2007-2030 Projects, Figure IV-1
**Tooele City Transportation Master Plan (January 2001)